Moderadores: Lepanto, poliorcetes, Edu, Orel
...
AIR FORCE
The Boeing Co., St. Louis, Missouri, has been awarded a $79,100,000 indefinite-delivery/indefinite-quantity contract for B61-12 Tail Kit Assembly (TKA) surveillance and sustainment support. This contract provides the government with engineering services and technical expertise as needed across various disciplines for B61-12 TKA support. Work will be performed in St. Louis, Missouri, and is expected to be completed by Sept. 14, 2026. This contract includes Foreign Military Sales to NATO members that are to be determined. This award is the result of a sole source acquisition. Fiscal 2021 operations and maintenance funds in the amount of $352,045 are being obligated at the time of award in the initial task order. Air Force Nuclear Weapons Center, Kirtland Air Force Base, New Mexico, is the contracting activity (FA9422-21-D-0001).
...
...
NAVY
Alliant Techsystems Operations LLC, a wholly-owned subsidiary of Northrop Grumman Defense Systems Inc., Northridge, California, is awarded a $41,231,833 firm-fixed-price contract. This contract procures low rate initial production Lot One of the AGM-88G Advanced Anti-Radiation Guided Missile - Extended Range (AARGM-ER). This contract provides for the production and delivery of 16 AGM-88G AARGM-ER All Up Rounds, six AGM-88G AARGM-ER Captive Air Training Missiles, four Common Munitions BIT Reprogramming Equipment Plus interface devices, initial spares, and required supplies and support. Work will be performed in Northridge, California (61%); Rocket Center, West Virginia (21%); China Lake, California (11%); and Ridgecrest, California (7%), and is expected to be completed in March 2024. Fiscal 2021 weapons procurement (Navy) funds in the amount of $41,231,833 will be obligated at time of award, none of which will expire at the end of the current fiscal year. This contract was not competitively procured pursuant to 10 U.S. Code 2304(c)(1). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N0001921C0044).
...
poliorcetes escribió:Pues le veo ventajas:
1. Es más eficaz para plegar aletas sobre él, e incluso un ala pivotante.
2. Permite integrar de manera más limpia la entrada de un ramjet
3. Si no es apilable de forma directa, sí que se puede colocar en filas verticales ocupando menos altura
4. NPI... pero podría ser que para cierta envolvente el cuerpo tuviera una capacidad de sustentación marginal?
poliorcetes escribió:Pero es muy pequeño para ser hipersónico, ¿no?
By Champi: NUEVO MISIL CUADRADOTE
...
The Boeing Corp., St. Louis, Missouri, has been awarded a $70,000,000 indefinite-delivery/indefinite-quantity contract for GBU-57 Massive Ordnance Penetrators. This contract provides for the procurement via delivery order of GBU-57 Massive Ordnance Penetrator carriage and release equipment. The location of performance is Saint Charles, Missouri, and work is expected to be completed by April 30, 2026. This award is the result of a sole source acquisition. Fiscal 2019 3011 (production) funds in the amount of $18,025,770 are being obligated at the time of award. Air Force Life Cycle Management Center, Eglin Air Force Base, Florida, is the contracting activity (FA8681-19-D-0008).
...
...
Simmonds Precision Products, Vergennes, Vermont, is awarded a $13,712,394 modification (P00004) to previously awarded cost-plus-fixed-fee contract N00014-19-C-1062 for the Low-Cost Air-Drop Munition (LCAM) weapon system development program. The total cumulative face value of the contract is $28,522,207 and no options were proposed. Work will be performed in Vergennes, Vermont (74.4%); Arlington, Virginia (5.2%); Indian Head, Maryland (3.9%); Yuma, Arizona (3.8%); Burlington, Vermont (3%); Torrance, California (2.6%); Westminster, Maryland (2.3%); Rancho Cordova, California (1.9%); and various places below 1%. Modification P00004 extends the period of performance; work is expected to be completed by Dec. 31, 2022. Fiscal 2020 research, development, test and evaluation (Navy) funds in the amount of $13,611,788 are obligated at time of award and will expire at the end of the current fiscal year. The Office of Naval Research, Arlington, Virginia, is the contracting activity (N00014-19-C-1062).
...
- ¿Hipersónico? Dudo que sea sostenido por mucho tiempo. Olvidaros de cabezas baratas de seguimiento que vean algo a través del plasma o de la sustancia que aguante el calor a Mach4+
Orel escribió:Desde luego, esa propuesta de FCAAM de Diehl tiene toda la pinta de ser así para mayor velocidad. pero ni idea. En todo caso:- ¿Hipersónico? Dudo que sea sostenido por mucho tiempo. Olvidaros de cabezas baratas de seguimiento que vean algo a través del plasma o de la sustancia que aguante el calor a Mach4+
Para que no despiste, recordemos que p.ej. un ASRAAM alcanza Mach 3,5 y un AMRAAM o Meteor alcanzan Mach 4+, y sus sensores "ven". Para ese problema hipersónico estaríais hablando de bastante más de Mach 4+ (¿Mach 5, Mach 6?)
Saludos
Orel escribió:Desde luego, esa propuesta de FCAAM de Diehl tiene toda la pinta de ser así para mayor velocidad. pero ni idea. En todo caso:- ¿Hipersónico? Dudo que sea sostenido por mucho tiempo. Olvidaros de cabezas baratas de seguimiento que vean algo a través del plasma o de la sustancia que aguante el calor a Mach4+
Para que no despiste, recordemos que p.ej. un ASRAAM alcanza Mach 3,5 y un AMRAAM o Meteor alcanzan Mach 4+, y sus sensores "ven". Para ese problema hipersónico estaríais hablando de bastante más de Mach 4+ (¿Mach 5, Mach 6?)
Saludos
...
General Dynamics-Ordnance and Tactical Systems (OTS) Inc., Williston, Vermont (N0016421DWP64): Danko Arlington Inc.,* Baltimore, Maryland (N0016421DWP91); and General Tool Co.,* Cincinnati, Ohio (N0016421DWP92), are awarded a combined $14,641,032 firm-fixed-price, indefinite-delivery/indefinite-quantity multiple award contract for the new manufacture of MK-82 guided missile director sub-assemblies. Each awardee will be awarded an amount greater than the $25,000 (minimum contract guarantee per awardee) at contract award. There are no options included on this contract. Work will be performed in Saco, Maine (46.4%); Baltimore, Maryland (29.2%); and Cincinnati, Ohio (24.4%), and is expected to be completed by September 2026. Fiscal 2021 operation and maintenance (Navy) funding in the amount of $4,147,733 (28.3%) will be obligated at the time of award and will expire at the end of the current fiscal year. All other funding will be made available at the delivery order level as contracting actions occur. This contract was competitively procured via the beta.sam.gov website, with three offers received. The Naval Surface Warfare Center, Crane, Indiana, is the contracting activity.
...
Vorlon escribió:https://twitter.com/MIL_STD/status/1442034351105929217
hilo sobre el nuevo lanzador Dynetics Enduring Shields.
saludos
Usuarios navegando por este Foro: No hay usuarios registrados visitando el Foro y 0 invitados