"
Entrega dos primeiros mísseis A-Darter operacionais programada para dezembro":
https://www.aereo.jor.br/2024/02/23/ent ... -dezembro/Las primeras unidades para Sudáfrica a entregar a partir de junio son de entrenamiento (21), después llegarán las operacionales (41) en diciembre y estas se entregarán hasta 2028. Esta última fecha era originalmente octubre de 2017, lo que indica 11 años de retrasos.
Recordemos que el otro socio de este misil, Brasil, de momento ha comprado Iris-T.
Nota DSCA de AMRAAM C8 y SDB II para Italia:
https://www.dsca.mil/press-media/major- ... r-missiles...
The Government of Italy has requested to buy twelve (12) AIM-120C-8 Advanced Medium Range Air-to-Air Missiles (AMRAAM) that will be added to a previously implemented case whose value was under the congressional notification threshold. The original Foreign Military Sales (FMS) case, valued at $32.5 million ($23.0 million in Major Defense Equipment (MDE)), included twelve (12) AIM-120C-8 AMRAAM missiles. This notification is for a combined total of twenty-four (24) AIM-120C-8 AMRAAM missiles. Also included are Common Munitions Built-in-Test (BIT)/Reprogramming Equipment (CMBRE); ADU-891 Adaptor Group Test Set; AMRAAM containers and support equipment; integration and test support and equipment; munitions support and support equipment; spare parts, consumables and accessories, and repair and return support; contractor logistics support; classified software delivery and support; classified and unclassified publications and technical documentation; studies and surveys; U.S. Government and contractor engineering, technical, and logistics support services; and other related elements of logistics and program support. The estimated total cost is $69.3 million.
...
https://www.dsca.mil/press-media/major- ... er-bomb-ii...
The Government of Italy has requested to buy one hundred twenty-five (125) Guided Bomb Unit (GBU)-53/B Small Diameter Bombs-Increment II (SDB-II) All-Up-Rounds (AURs); and eight (8) GBU-53/B SDB-II Captive Carry Reliability Tests (CCRTs) that will be added to a previously implemented case whose value was under the congressional notification threshold. The original FMS case, valued at $22.5 million ($9.7 million in MDE), included twenty-four (24) GBU-53/B SDB-II AURs; and four (4) GBU-53/B SDB-II CCRTs. The Government of Italy has also requested a new FMS case that includes twenty-four (24) GBU-53/B SDB-II AURs; and two (2) GBU-53/B SDB-II CCRTs. This notification is for a combined total of one hundred seventy-three (173) GBU-53/B SDB-II AURs; and fourteen (14) GBU-53/B SDB-II CCRTs. Also included are SDB-II Weapon Load Crew Trainers (WLCT) and Practical Explosive Ordnance Disposal Trainers (PEST); munitions support and support equipment; unclassified software delivery and support; spare parts, consumables and accessories, and repair and return support; modifications and maintenance support; unclassified publications and technical documentation; studies and surveys; U.S. Government and contractor engineering, technical, and logistics support services; and other related elements of logistics and program support. The estimated total cost is $150 million.
...