Moderadores: Lepanto, poliorcetes, Edu, Orel
Olvidad el Meteor que es de la versión E
Yo con mucho gusto donaba F-18 a cambio de F-35
Atticus escribió:Yo con mucho gusto donaba F-18 a cambio de F-35
Si te refieres a los CX que acabamos de retirar estoy de acuerdo. Perderiamos capacidades, pero....
Lazarus escribió:Atticus escribió:Yo con mucho gusto donaba F-18 a cambio de F-35
Si te refieres a los CX que acabamos de retirar estoy de acuerdo. Perderiamos capacidades, pero....
Donde hay que firmar ?
Les regalamos todos los F18 "as is", listo para volar, y tito Biden nos regala 48 F35A.
Les regalamos todos los F18 "as is", listo para volar, y tito Biden nos regala 48 F35A.
Atticus escribió:Les regalamos todos los F18 "as is", listo para volar, y tito Biden nos regala 48 F35A.
¿De verdad le caemos tan mal a Biden?
Sabes que los F18 estan para substituir en menos de una decada. Y ya sabes quien va a ganar ese contrato, no ?
Filipinas elige el Gripen para modernizar su fuerza aérea
tenía entre sus contrincantes el F-16V, que no se descarta que Manila lo compre en el futuro
https://www.infodefensa.com/texto-diari ... erza-aerea
...
Air Force officials said that they reduced the planned F-15EX procurement quantities in the FY 2023 budget request from 144 to 80 in an effort to request funds for higher priority programs. They added that the F-15EX program’s June 2022 cost estimate indicated that the available procurement funding was insufficient to order two of the planned aircraft. As a result, the program further reduced the planned F-15EX procurement quantities to 78.
...
Boeing planned to deliver the first Lot 1B aircraft in December 2022 but delayed those deliveries by 6 months due to several production-related issues. The primary driver of these delays was supplier quality problems related to a critical component in the forward fuselage assembly that ensures safety of flight. Program officials said that those quality issues were corrected as of the production of the seventh and eighth aircraft. According to a DCMA report, Boeing also used tooling that had a design error, which caused inaccurately drilled holes for the windscreen installation on the third through sixth aircraft.
Boeing made adjustments to the drilling tool to address the issue. Program officials said that the issue was identified before it affected the seventh aircraft and Boeing plans to redrill the holes on affected aircraft before beginning production of the Lot 2 aircraft. Program officials added that each Lot 2 aircraft has also been delayed 2 months due to these Lot 1B production-related issues.
...
Qatar is reported to be preparing to transfer 12 Mirage 2000-5 fighters to Indonesia.
https://twitter.com/alert5/status/16684 ... LfuqcuAAAA
Taiwán has given assurance that its Mirage 2000-5 remain available for service, amid concerns about costs and sustainment for the two-decade old fleet.
https://www.flightglobal.com/defence/ta ... 92.article
Boeing tampoco es capaz de entregar el F-15EX en tiempo y forma.
Usuarios navegando por este Foro: Google [Bot] y 26 invitados