Moderadores: Lepanto, poliorcetes, Edu, Orel
Invoco a Orel. ¿Sería buena idea evolucionar el Harrier, o al menos modernizarlo al estilo reconstrucción de los Ch47?
rubin75 escribió:Don Atticus, es usted un buen activo racional para el Foro. Siga así.
s illustrated in a PowerPoint slide, the future wing would still include 44 strike fighters as it does now, but the mix of Block 4 F-35C Lightning II fighters and Block III F/A-18E/F Super Hornet fighters changes from 10 and 34, respectively, to 16 and 28. The strike fighters would equip one 16-aircraft F-35C squadron and three 10-aircraft F/A-18E/F squadron.
The other aircraft in the wing would include five-to-seven EA-18G Growler electronic combat aircraft, five E-2D Advanced Hawkeye command-and-control aircraft, six-to-ten MH-60 Seahawk helicopters, three CMV-22B Osprey carrier-onboard delivery aircraft, and five-to-nine MQ-25 Stingray aerial tanker unmanned aircraft.
Next year, USS Carl Vinson will deploy, taking a 10-aircraft F-35C squadron (Strike Fighter Squadron 147) on the aircraft’s first carrier deployment. The ship also will carry two 10-aircraft F/A-18E squadrons and one 14-aircraft F/A-18F squadron, according to a source.
The deployment also will mark the first for the CMV-22B.
yasiw escribió:Parece que no va a ser Barack Obama el primer afroamericano en darle nombre a un Supercarrier de la Navy:
https://www.npr.org/2020/09/29/917816651/a-military-first-a-supercarrier-is-named-after-an-african-american-sailor?t=1601423920376
USS Doris Miller... ¿CVN-81?
Enviado desde mi EML-L09 mediante Tapatalk
yasiw escribió:Pongo de nuevo el link a la wiki que el anterior no iba:
...
NAVY
Northrop Grumman Systems Corp., Mission Systems Sector, Linthicum Heights, Maryland, was awarded a $100,798,804 fixed-price-incentive-fee and firm-fixed-price contract for follow-on production of Surface Electronic Warfare Improvement Program Block 3 electronic attack systems and hardware design modifications required for aircraft carrier and amphibious assault ship installation. This contract includes options, which if exercised, would bring the cumulative value of this contract to $1,164,529,315. Work will be performed in Baltimore, Maryland (55%); Tampa, Florida (6%); Andover, Massachusetts (5%); Chelmsford, Massachusetts (4%); Rochester, New York (3%); San Diego, California (3%); Los Angeles, California (2%); Winona, Minnesota (2%); Stafford Springs, Connecticut (2%); Glendale, Arizona (1%); Nashua, New Hampshire (1%); Elk Grove Village, Illinois (1%); White Marsh, Maryland (1%); Tucson, Arizona (1%); Chandler, Arizona (1%); Washington, North Carolina (1%); Woodridge, Illinois (1%); Richardson, Texas (1%); Minneapolis, Minnesota (1%); El Cajon, California (1%); Hiawatha, Iowa (1%); Littleton, Colorado (1%); Glendale, California (1%); and miscellaneous locations - each less than 1% (4%), and is expected to be completed by May 2023. If all options are exercised, work will continue through September 2026. Fiscal 2019 other procurement (Navy) (67%); and fiscal 2020 other procurement (Navy) (33%) funding in the amount of $100,798,804 will be obligated at time of award and will not expire at the end of the current fiscal year. This contract was competitively procured via the Federal Business Opportunities website with one offer received. The Naval Sea Systems Command, Washington, D.C., is the contracting activity (N00024-20-C-5519). (Awarded Sept. 30, 2020)
...
yasiw escribió:Resumen de artículo en la RGdM del capitán de navío Luis Díaz-Bedia Astor sobre la importancia de mantener nuestra aviación embarcada (y consecuencias de perderla), a cargo de Julio Maíz Sanz en defensa.com:
https://www.defensa.com/espana/consecuencias-para-armada-espanola-perder-aviacion-ala-fija
Lo que más me llama la atención es que se atreve a hablar de costes...
Orel escribió:Y más importante aún, como bien explicó Martín Lon en nuestro podcast: lo primero y más importante en la guerra es la voluntad de hacerla. Varios de los puntos citan pérdida de independencia española a la hora de hacer la guerra por nuestra cuenta. ¿Cuándo un gobierno español va a tener la voluntad de ordenar algo así? Así estamos.
Saludos
Usuarios navegando por este Foro: No hay usuarios registrados visitando el Foro y 0 invitados