Moderadores: Lepanto, poliorcetes, Edu, Orel
...
BAE Systems Land & Armaments L.P., Sterling Heights, Michigan, is awarded an $89,467,675 firm-fixed-price modification (P00148) to previously awarded contract M67854-16-0006 for Amphibious Combat Vehicles (ACV). The total cumulative face value of the contract is $1,825,427,258. This contract modification provides for the exercise of options for the procurement of 14 full-rate production ACV Command variants and associated production, and fielding and support costs. Work will be performed in York, Pennsylvania (60%); Aiken, South Carolina (15%); San Jose, California (15%); Sterling Heights, Michigan (5%); and Stafford, Virginia (5%), with an expected completion date of July 2024. Fiscal 2022 procurement (Marine Corps) funds in the amount of $89,467,675 will be obligated at the time of award, and will not expire at the end of the current fiscal year. Marine Corps Systems Command, Quantico, Virginia, is the contracting activity (M67854-16-C-0006).
...
Lepanto escribió:Eslovenia, representada por la Organización para la Cooperación Conjunta en Armamento (OCCAR), firmó un contrato con el consorcio Rheinmetall-Krauss-Maffei Wegmann (KMW) Artec para comprar 45 vehículos blindados Boxer en cuatro variantes por un valor total de 281,5 millones de €, anunciado en un comunicado de prensa conjunto el 17 de mayo.
...
OBJECTIVE:
The Army Contracting Command, Detroit Arsenal, in support of the Light Armored Vehicles (LAV) Program Manager, is seeking sources that can demonstrate the capability to modify software on the Control Electronics Panel (CEP) Assembly to include an updated “Silent Watch” duration for the Automatic Fire Suppression System (AFSS). The vendor will modify, test, and deliver an updated software version three months after contract award.
The vendor is responsible for providing a software development plan with substantiating artifacts that demonstrate that their modified software will meet performance requirements. The USG does not own and therefore cannot provide the Technical Data Package (TDP) for the CEP and the AFSS system.
In addition to the software update, the following will be required:
Publications and Logistics Development (Drawings and Engineering Data for Provisioning)
Bill of materials and software version identification for the updated software solution
...
Usuarios navegando por este Foro: Google [Bot] y 14 invitados